Service Area

Commercial

Project Size

6 acres

Project Length

15 weeks

Warranty

2 years (material + workmanship)

Tucker Town Center

A Full Sitework Package, Self-Performed

Summit Construction & Development was brought on by the city engineering office to deliver the sitework package for the Tucker Town Center in Forsyth County. The site presented a compressed schedule tied to a tenant delivery date. We sequenced clearing and grading to run in parallel, self-performing utilities, concrete so the job stayed on one schedule with one point of accountability. The project was completed within the contract term, turning the site over ready for vertical construction.

Scope of work
  • Installed 5,950 LF of storm drainage plus 6 detention structures
  • Set 1,300 LF of sanitary sewer with 4 manholes
  • Completed with full OSHA compliance and zero recordables
  • Placed 47,000 SF of sidewalk and dumpster pads
  • Poured 2,450 LF of curb & gutter and all ADA ramps
Built to Comply

Public work runs on credibility. Every Summit project is staffed and documented to meet it.

  • GDOT prequalified contractor
  • OSHA-compliant crews on site daily
  • Bonded and fully insured
  • DBE-certified
  • Certified erosion and sediment control personnel on site
Get a Quote

Need a site turned over on time?

We appreciate your consideration. Our team will get back to you as soon as possible.

Contact Us Today