Service Area

Municipal

Project Size

13 acres

Project Length

26 weeks

Warranty

18 months (material + workmanship)

Peachtree Elementary School

Built to Grade, Built to Last

Summit Construction & Development was brought on by a regional general contractor to deliver the sitework package for the Peachtree Elementary School in Hall County. The site presented buried debris from a prior structure on the north end. We balanced material on site to avoid export costs, self-performing clearing, demolition so the job stayed on one schedule with one point of accountability. The project was completed within the contract term, turning the site over ready for building permit inspection.

Scope of work
  • Staked limits of disturbance and protected specimen trees
  • Crushed and recycled concrete on site for reuse as base
  • Removed 400 LF of abandoned foundation and slab
  • Removed and hauled off 25 truckloads of timber and brush
  • Completed with full OSHA compliance and zero recordables
Built to Comply

Public work runs on credibility. Every Summit project is staffed and documented to meet it.

  • Full submittal and as-built documentation package
  • DBE-certified
  • OSHA-compliant crews on site daily
  • Certified erosion and sediment control personnel on site
  • GDOT prequalified contractor