22-13 Haynes Bridge Road at Old Alabama Rd. Intersection
Johns Creek, GA
Asphalt
Concrete
Grading
Utilities
What goes underground has to be done right. We manage full installation, testing, and tie-ins before backfill.
What goes underground is critical to everything built above it. Summit Construction & Development installs storm drainage, water distribution, and sanitary sewer systems for roadway, municipal, and site-development projects, delivering the precision infrastructure must have to perform for decades.
Our capabilities include storm pipes and structures, water mains, sanitary sewer systems, manholes, fire hydrants, valves, service connections, utility structures, tie-ins, and associated excavation and restoration.
From trench preparation and bedding to pipe installation, backfill, compaction, testing, and final connection, our crews construct each system in accordance with approved plans, specifications, applicable standards, and inspection requirements.
We appreciate your consideration. Our team will get back to you as soon as possible.
Request a Bid