Service Area

Municipal

Project Size

21 acres

Project Length

7 weeks

Warranty

1 year (material + workmanship)

Doraville Fire Station

Built to Grade, Built to Last

Summit Construction & Development was brought on by a retail development group to deliver the sitework package for the Doraville Fire Station in Cobb County. The site presented a compressed schedule tied to a tenant delivery date. We phased the work to keep the schedule moving, self-performing utilities, concrete so the job stayed on one schedule with one point of accountability. The project was completed on schedule, turning the site over complete with final stabilization and landscaping.

Scope of work
  • Installed 3,700 LF of storm drainage plus 7 detention structures
  • Installed 3,650 LF of water main including fire service and hydrants
  • Completed with full OSHA compliance and zero recordables
  • Poured 5,650 LF of curb & gutter and all ADA ramps
  • Placed 26,000 SF of sidewalk and dumpster pads
Built to Comply

Public work runs on credibility. Every Summit project is staffed and documented to meet it.

  • DBE-certified
  • OSHA-compliant crews on site daily
  • GDOT prequalified contractor
  • Daily safety briefings and toolbox talks
Get a Quote

Have a project like this?

We appreciate your consideration. Our team will get back to you as soon as possible.

Contact Us Today