Service Area

Industrial

Project Size

13 acres

Project Length

5 weeks

Warranty

1 year (material + workmanship)

Contract Type

Design-Build

Mableton Logistics Center

Grading, Utilities, and Paving Under One Roof

Summit Construction & Development was brought on by a retail development group to deliver the sitework package for the Mableton Logistics Center in Hall County. The site presented a compressed schedule tied to a tenant delivery date. We staged the utility installation ahead of mass grading, self-performing concrete, demolition so the job stayed on one schedule with one point of accountability. The project was completed within the contract term, turning the site over complete with final stabilization and landscaping.

Scope of work
  • Removed 3,200 LF of abandoned foundation and slab
  • Placed 5,000 SF of sidewalk and dumpster pads
  • Poured 2,500 LF of curb & gutter and all ADA ramps
  • Completed with full OSHA compliance and zero recordables
  • Crushed and recycled concrete on site for reuse as base
Built to Comply

Public work runs on credibility. Every Summit project is staffed and documented to meet it.

  • GDOT prequalified contractor
  • Bonded and fully insured
  • Full submittal and as-built documentation package
  • OSHA-compliant crews on site daily