Service Area

Commercial

Project Size

19 acres

Project Length

27 weeks

Warranty

1 year (material + workmanship)

Mableton Corporate Campus

Turned Over Ready to Build

Summit Construction & Development was brought on by the county public works department to deliver the sitework package for the Mableton Corporate Campus in Gwinnett County. The site presented unstable subgrade that needed undercut and replacement. We worked night shifts on the roadway tie-ins, self-performing asphalt, demolition so the job stayed on one schedule with one point of accountability. The project was completed within the contract term, turning the site over complete with final stabilization and landscaping.

Scope of work
  • Removed 5,200 LF of abandoned foundation and slab
  • Placed 5,400 tons of asphalt across the drive aisles and loading area
  • Demolished and removed a 69,000 SF existing structure
  • Completed with full OSHA compliance and zero recordables
  • Milled and resurfaced 14,000 SF of existing pavement
Built to Comply

Public work runs on credibility. Every Summit project is staffed and documented to meet it.

  • Bonded and fully insured
  • Daily safety briefings and toolbox talks
  • Certified erosion and sediment control personnel on site
  • Full submittal and as-built documentation package
  • GDOT prequalified contractor
Get a Quote

Have a project like this?

We appreciate your consideration. Our team will get back to you as soon as possible.

Contact Us Today